Tanazpathan
View on GitHub ↗active 2024-01-11 → 2024-09-08 (UTC) · 11 repositories
Complete coverage26,565 / 26,565 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-08-25 (UTC)
Events
64
Pushes
33
Pull requests
4
Issues
0
Reviews
0
Repositories
11
Activity over time
Daily event counts in the loaded window
Line chart, 242 days from 2024-01-11 to 2024-09-08. Pushes: 33 total, peak 13 in a day. Pull requests: 4 total, peak 3 in a day. Issues: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
Repositories worked on
Ranked by contributions — pushes, PRs, issues, reviews and comments, so stars and forks do not inflate the list
| Repository | Contributions | Pushes | PRs | Issues | Comments | Last seen |
|---|---|---|---|---|---|---|
| Tanazpathan/ContentBased_RecSys | 13 | 13 | 0 | 0 | 0 | 2024-08-12 |
| Tanazpathan/Big-data | 12 | 12 | 0 | 0 | 0 | 2024-05-07 |
| Tanazpathan/localrepo | 4 | 3 | 1 | 0 | 0 | 2024-05-21 |
| DistilledCode/big_data_assignments | 3 | 0 | 3 | 0 | 0 | 2024-05-22 |
| Tanazpathan/big_data_assignments | 3 | 3 | 0 | 0 | 0 | 2024-05-22 |
| Tanazpathan/test_rep | 1 | 1 | 0 | 0 | 0 | 2024-05-22 |
| Tanazpathan/testrepo | 1 | 1 | 0 | 0 | 0 | 2024-05-22 |
| Tanazpathan/NMDS_Project | 0 | 0 | 0 | 0 | 0 | 2024-09-08 |
| Tanazpathan/WoC6.0-DL-neural-style-transfer-Tanaz_Pathan | 0 | 0 | 0 | 0 | 0 | 2024-01-11 |
| Tanazpathan/Swiggy_Analysis | 0 | 0 | 0 | 0 | 0 | 2024-08-12 |
| Tanazpathan/WoC6.0-DL-name-generation-model-Tanaz-Pathan | 0 | 0 | 0 | 0 | 0 | 2024-01-21 |
Works with
People who contribute to the same repositories, ranked by how many they share · automation excluded, or every account would appear to work with everyone
| Contributor | Shared repos | Repositories in common |
|---|---|---|
| DistilledCode | 1 |
Counts cover only the window loaded into ClickHouse and count events, not this account's lifetime totals on GitHub.