Skip to content

active 2023-09-072024-07-01 (UTC) · 6 repositories

Complete coverage26,359 / 26,359 hourly files (100%) · 2 absent upstream2023-08-152026-08-17 (UTC)
Events
169
Pushes
81
Pull requests
24
Issues
1
Reviews
16
Repositories
6

Activity over time

Daily event counts in the loaded window

Line chart, 299 days from 2023-09-07 to 2024-07-01. Pushes: 81 total, peak 8 in a day. Pull requests: 24 total, peak 6 in a day. Issues: 1 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues

Repositories worked on

Ranked by contributions — pushes, PRs, issues, reviews and comments, so stars and forks do not inflate the list

RepositoryContributionsPushesPRsIssuesCommentsLast seen
rl-institut/oemof-tabular-plugins13376241172024-06-20
rl-institut/Uganda_oemof.solph220002023-09-07
rl-institut/WEFESiteAnalyst110002024-02-19
rl-institut/multi-vector-simulator100002023-11-08
sedos-project/oemof.industry110002024-07-01
rl-institut/WEFEConfigurator110002024-07-01

Works with

People who contribute to the same repositories, ranked by how many they share · automation excluded, or every account would appear to work with everyone

Counts cover only the window loaded into ClickHouse and count events, not this account's lifetime totals on GitHub.