Skip to content

fammsproject

View on GitHub ↗

active 2025-10-31 → 2026-03-04 (UTC) · 3 repositories

Complete coverage27,721 / 27,721 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-13 (UTC)
Events
19
Pushes
18
Pull requests
1
Issues
0
Reviews
0
Repositories
3

Activity over time

Daily event counts in the loaded window

Line chart, 125 days from 2025-10-31 to 2026-03-04. Pushes: 18 total, peak 9 in a day. Pull requests: 1 total, peak 1 in a day. Issues: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues

Pull requests and issues are under-captured in the later part of this window. GH Archive progressively stopped recording non-push events during 2026 — −95% or worse by the end of the window. A decline in those two series reflects the archive rather than this account. Pushes stay reliable throughout, so read them as the real signal. Data health has the measurements.

Repositories worked on

Ranked by contributions — pushes, PRs, issues, reviews and comments, so stars and forks do not inflate the list

RepositoryContributionsPushesPRsIssuesCommentsLast seen
ICAERUS-EU/OCT_FAMMS_PROJECT17170002025-11-05
fammsproject/Zenodo_Datasets110002026-02-12
ICAERUS-EU/Zenodo_Datasets101002026-03-04

Works with

People who contribute to the same repositories, ranked by how many they share · automation excluded, or every account would appear to work with everyone

Counts cover only the window loaded into ClickHouse and count events, not this account's lifetime totals on GitHub.