Skip to content

효율적인 사내 자원관리를 위한 ERP 시스템

active 2025-04-02 → 2026-02-24 (UTC)

Complete coverage27,933 / 27,933 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-21 (UTC)
Events
485
Pushes
194
Pull requests
138
Issues
65
Stars
1
Forks
5

Activity over time

Daily event counts in the loaded window

Line chart, 329 days from 2025-04-02 to 2026-02-24. Pushes: 194 total, peak 24 in a day. Pull requests: 138 total, peak 24 in a day. Issues: 65 total, peak 15 in a day. Comments: 0 total, peak 0 in a day. Stars: 1 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
GGobung-of-Simba13660420
HelenHam9644390
KY1298344240
swparabellum7543290
JosephBean7340

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.