Skip to content

2차 프로젝트의 제조측 시스템 관리 repository

active 2025-02-05 → 2025-04-16 (UTC)

Complete coverage27,935 / 27,935 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-21 (UTC)
Events
238
Pushes
90
Pull requests
45
Issues
41
Stars
0
Forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 71 days from 2025-02-05 to 2025-04-16. Pushes: 90 total, peak 16 in a day. Pull requests: 45 total, peak 12 in a day. Issues: 41 total, peak 9 in a day. Comments: 2 total, peak 2 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
GGobung-of-Simba452190
ljh880427412372
JosephBean372380
KY129241180
kdg678219790
swparabellum11430
HelenHam2110

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.