Skip to content

Workspace for Mojave infrastructure components, including full node, sequencer, prover, and cryptographic utilities

active 2025-06-25 → 2026-03-08 (UTC)

Complete coverage27,817 / 27,817 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-17 (UTC)
Events
1.5K
Pushes
480
Pull requests
147
Issues
121
Stars
9
Forks
5

Activity over time

Daily event counts in the loaded window

Line chart, 257 days from 2025-06-25 to 2026-03-08. Pushes: 480 total, peak 16 in a day. Pull requests: 147 total, peak 8 in a day. Issues: 121 total, peak 7 in a day. Comments: 303 total, peak 21 in a day. Stars: 9 total, peak 3 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
sfroment2901344442
Kanet1105278954635
Copilot24965120
d-roak169441262
Giwook-Han11766920
Drizzle2108560156
datactor5522512
hungp2812554163
0xaldric141111
magnified10312022

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 9 stars here means stars gained during the window, not the repo's star count.