active 2024-10-04 → 2025-04-22 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 201 days from 2024-10-04 to 2025-04-22. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 25 total, peak 14 in a day. Comments: 2 total, peak 2 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| 4LanCrane | 27 | 0 | 0 | 2 |
Recent activity
Latest issues, pull requests and releases
- Issue#164LanCrane2025-04-22 13:36implement introduction page part 2
- Issue#164LanCrane2025-02-23 18:56implement introduction page part 2
- Issue#154LanCrane2024-11-12 18:06Create project with blank pages
- Issue comment#114LanCrane2024-10-09 18:20Create a ERP page
- Issue comment#144LanCrane2024-10-09 18:18Create medals page
- Issue#94LanCrane2024-10-09 18:12Create account management page with basic functionality implemented
- Issue#84LanCrane2024-10-09 18:12Create Home Screen and any relevant components
- Issue#64LanCrane2024-10-09 18:12Create Logo for project
- Issue#54LanCrane2024-10-09 18:10Create a project and add the screens needed (blank) to the project
- Issue#144LanCrane2024-10-09 17:41Create medals page
- Issue#44LanCrane2024-10-09 17:33Create wire diagrams
- Issue#14LanCrane2024-10-09 17:32Further work on devlopment notes discussed within meeting
- Issue#134LanCrane2024-10-09 17:22create activity screen
- Issue#124LanCrane2024-10-04 16:12create the set goals checklist screen
- Issue#114LanCrane2024-10-04 14:13Create a ERP page where the user can enter their steps on fear ladder and assign difficulty score
- Issue#104LanCrane2024-10-04 14:03Create Start ERP Introduction Page
- Issue#94LanCrane2024-10-04 13:59Create account management page with basic functionality implemented
- Issue#84LanCrane2024-10-04 13:58Create Home Screen and any relevant components
- Issue#74LanCrane2024-10-04 13:58implement login screen and connect to database
- Issue#64LanCrane2024-10-04 13:55Create Logo for project
- Issue#54LanCrane2024-10-04 13:24Create basic design for all screens/pages
- Issue#44LanCrane2024-10-04 13:19Create wire diagrams
- Issue#34LanCrane2024-10-04 13:11Work On pre development steps discussed within meeting
- Issue#34LanCrane2024-10-04 13:11Work On pre development steps discussed within meeting
- Issue#24LanCrane2024-10-04 13:11Decide on project and pick supervisor
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.