Skip to content

active 2024-10-042025-04-22 (UTC)

Complete coverage26,704 / 26,704 hourly files (100%) · 2 absent upstream2023-08-152026-08-31 (UTC)
Events
29
Pushes
0
Pull requests
0
Issues
25
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 201 days from 2024-10-04 to 2025-04-22. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 25 total, peak 14 in a day. Comments: 2 total, peak 2 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
4LanCrane27002

Recent activity

Latest issues, pull requests and releases

  • Issue#164LanCrane2025-04-22 13:36
    implement introduction page part 2
  • Issue#164LanCrane2025-02-23 18:56
    implement introduction page part 2
  • Issue#154LanCrane2024-11-12 18:06
    Create project with blank pages
  • Issue comment#114LanCrane2024-10-09 18:20
    Create a ERP page
  • Issue comment#144LanCrane2024-10-09 18:18
    Create medals page
  • Issue#94LanCrane2024-10-09 18:12
    Create account management page with basic functionality implemented
  • Issue#84LanCrane2024-10-09 18:12
    Create Home Screen and any relevant components
  • Issue#64LanCrane2024-10-09 18:12
    Create Logo for project
  • Issue#54LanCrane2024-10-09 18:10
    Create a project and add the screens needed (blank) to the project
  • Issue#144LanCrane2024-10-09 17:41
    Create medals page
  • Issue#44LanCrane2024-10-09 17:33
    Create wire diagrams
  • Issue#14LanCrane2024-10-09 17:32
    Further work on devlopment notes discussed within meeting
  • Issue#134LanCrane2024-10-09 17:22
    create activity screen
  • Issue#124LanCrane2024-10-04 16:12
    create the set goals checklist screen
  • Issue#114LanCrane2024-10-04 14:13
    Create a ERP page where the user can enter their steps on fear ladder and assign difficulty score
  • Issue#104LanCrane2024-10-04 14:03
    Create Start ERP Introduction Page
  • Issue#94LanCrane2024-10-04 13:59
    Create account management page with basic functionality implemented
  • Issue#84LanCrane2024-10-04 13:58
    Create Home Screen and any relevant components
  • Issue#74LanCrane2024-10-04 13:58
    implement login screen and connect to database
  • Issue#64LanCrane2024-10-04 13:55
    Create Logo for project
  • Issue#54LanCrane2024-10-04 13:24
    Create basic design for all screens/pages
  • Issue#44LanCrane2024-10-04 13:19
    Create wire diagrams
  • Issue#34LanCrane2024-10-04 13:11
    Work On pre development steps discussed within meeting
  • Issue#34LanCrane2024-10-04 13:11
    Work On pre development steps discussed within meeting
  • Issue#24LanCrane2024-10-04 13:11
    Decide on project and pick supervisor

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.