The technical documentation for the 5G-ERA project
active 2023-09-27 → 2025-02-18 (UTC)
Complete coverage27,672 / 27,672 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-10 (UTC)
Events
213
Pushes
165
Pull requests
0
Issues
14
Stars
14
Forks
0
Activity over time
Daily event counts in the loaded window
Line chart, 511 days from 2023-09-27 to 2025-02-18. Pushes: 165 total, peak 17 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 14 total, peak 5 in a day. Comments: 15 total, peak 9 in a day. Stars: 14 total, peak 4 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| Renxidev | 40 | 40 | 0 | 0 |
| adrianLIrobotics | 32 | 8 | 0 | 12 |
| diwalipathak | 29 | 29 | 0 | 0 |
| Artonus | 26 | 21 | 0 | 3 |
| radu-popescu | 25 | 25 | 0 | 0 |
| appmdev | 19 | 19 | 0 | 0 |
| Kapim | 19 | 19 | 0 | 0 |
| klepo | 2 | 2 | 0 | 0 |
| PaulMcHard | 2 | 2 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 14 stars here means stars gained during the window, not the repo's star count.