Skip to content

Access-Point-Program/cohort-3-simulation-runner

View on GitHub ↗Related repositories →

active 2023-09-11 → 2025-07-01 (UTC)

Complete coverage27,378 / 27,378 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-09-28 (UTC)
Events
478
Pushes
141
Pull requests
91
Issues
38
Stars
0
Forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 660 days from 2023-09-11 to 2025-07-01. Pushes: 141 total, peak 12 in a day. Pull requests: 91 total, peak 7 in a day. Issues: 38 total, peak 8 in a day. Comments: 29 total, peak 4 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
calisward9936273
AyoAwodeyi8246241
chris-marfia739919
blenaneraio3318130
jgarner76261750
kwhitehead2316750
GabrielIvey012423
JoneyKroney11342
ReeboksTeen234121

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.