Skip to content

Alero-Awani/Batch-data-engineering-project

View on GitHub ↗Related repositories →

A batch Data Pipeline that retrieves data from a user purchase table and a movie review table and is transformed to form a user behaviour metric table.

active 2023-09-19 → 2025-05-14 (UTC)

Moved — now at alero-awani/batch-data-engineering-project since 2025-08-14. This page keeps the history recorded under the old name.Linked by GitHub's repository id. Older names can be missing when an old name was later reused (e.g. forked back). Charts on this page cover this name only.

Archive files: complete28,845 / 28,845 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-28 (UTC)Some event types are under-captured. Data limits →
Events
12
Pushes
0
Pull requests
0
Issues
2
Recorded stars
7
Recorded forks
2

Activity over time

Daily event counts in the loaded window

Line chart, 604 days from 2023-09-19 to 2025-05-14. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 2 total, peak 1 in a day. Comments: 1 total, peak 1 in a day. Recorded stars: 7 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Recorded stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
manuelinfosec3001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 7 stars here means stars gained during the window, not the repo's star count.