active 2024-01-20 → 2026-06-23 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 886 days from 2024-01-20 to 2026-06-23. Pushes: 8 total, peak 4 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 14 total, peak 14 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
Recent activity
Latest issues, pull requests and releases
- Issue#13mukhritz2024-05-21 02:16Information gathering process 2.1 Method used 2.2 Summary from method used (include example Interview/Questionnaire/Observation)
- Issue#13mukhritz2024-05-21 02:15Information gathering process 2.1 Method used 2.2 Summary from method used (include example Interview/Questionnaire/Observation)
- Issue#12mukhritz2024-05-21 02:15introduction
- Issue#11mukhritz2024-05-21 02:14Benefit and Overall Summary of Proposed System
- Issue#10mukhritz2024-05-21 02:14Logical DFD AS-IS system (Context Diagram, Diagram 0, Child)
- Issue#9mukhritz2024-05-21 02:14Non-functional Requirement (performance and control)
- Issue#8mukhritz2024-05-21 02:14Functional Requirement (input, process and output)
- Issue#7mukhritz2024-05-21 02:13Current business process (scenarios, workflow)
- Issue#6mukhritz2024-05-21 02:13Project planning
- Issue#5mukhritz2024-05-21 02:13Scope of the projects
- Issue#4mukhritz2024-05-21 02:12Objectives
- Issue#3mukhritz2024-05-21 02:12Proposed Solutions (include feasibility study – technical, operational, economical - CBA)
- Issue#2mukhritz2024-05-21 02:12Problem Statement
- Issue#1mukhritz2024-05-21 02:12Background Study
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.