Skip to content

Allevon412/Capstone-Project

View on GitHub ↗Related repositories →

This project was for my senior capstone at the University of Arizona. I wanted to create a payload that would potentially bypass AV / EDR products using techniques that negate or circumvent detection techniques used by these products.

active 2023-11-14 → 2024-12-23 (UTC)

Complete coverage27,627 / 27,627 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-09 (UTC)
Events
22
Pushes
5
Pull requests
0
Issues
1
Stars
10
Forks
3

Activity over time

Daily event counts in the loaded window

Line chart, 406 days from 2023-11-14 to 2024-12-23. Pushes: 5 total, peak 5 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 1 total, peak 1 in a day. Comments: 1 total, peak 1 in a day. Stars: 10 total, peak 3 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
Allevon4127501

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 10 stars here means stars gained during the window, not the repo's star count.