Skip to content

PDF to Alt-Text Generator (WIP).

active 2023-12-102024-01-24 (UTC)

Complete coverage26,474 / 26,474 hourly files (100%) · 2 absent upstream2023-08-152026-08-22 (UTC)
Events
36
Pushes
22
Pull requests
5
Issues
0
Stars
1
Forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 46 days from 2023-12-10 to 2024-01-24. Pushes: 22 total, peak 10 in a day. Pull requests: 5 total, peak 2 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 1 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
AltarisV262230
DrawingNea2020

Recent activity

Latest issues, pull requests and releases

  • Pull request#3AltarisV2024-01-15 21:27
  • Pull request#3DrawingNea2023-12-30 16:21
  • Pull request#2DrawingNea2023-12-23 19:44
  • Pull request#1AltarisV2023-12-11 10:10
  • Pull request#1AltarisV2023-12-11 10:10

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.