Skip to content

这是一个电子笔记,演示如何提高WPF/Avalonia开发效率

active 2025-06-052026-08-02 (UTC)

Partial coverage18,633 / 23,932 hourly files (78%) · 2 absent upstream · 5,296 failed, retryable2023-11-192026-08-12 (UTC)— sampled evenly across the window, so rankings and trends hold; absolute counts scale up.
Events
213
Pushes
205
Pull requests
0
Issues
1
Stars
2
Forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 424 days from 2025-06-05 to 2026-08-02. Pushes: 205 total, peak 11 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 1 total, peak 1 in a day. Comments: 0 total, peak 0 in a day. Stars: 2 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
Axvser20220200
ZjzMisaka1000

Recent activity

Latest issues, pull requests and releases

  • Issue#3ZjzMisaka2025-12-08 06:57
    [BUG] 有关依赖Task.Delay与循环的等待

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 2 stars here means stars gained during the window, not the repo's star count.