Skip to content

A Tool for integrated Quality Control and Preprocessing on FASTQ or BAM/CRAM files

active 2023-08-31 → 2026-01-11 (UTC)

Complete coverage27,553 / 27,553 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-06 (UTC)
Events
59
Pushes
3
Pull requests
4
Issues
5
Stars
28
Forks
4

Activity over time

Daily event counts in the loaded window

Line chart, 865 days from 2023-08-31 to 2026-01-11. Pushes: 3 total, peak 2 in a day. Pull requests: 4 total, peak 2 in a day. Issues: 5 total, peak 1 in a day. Comments: 11 total, peak 3 in a day. Stars: 28 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
berry086005
youngchan9195310
starsareintherose4031
anshrly2001
fallinwind2001
ChenZx12342000
eastreen1001
wchenqi1001
kabilov1001
Fzwwww1000

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 28 stars here means stars gained during the window, not the repo's star count.