Skip to content

Brailyn-Perez/TaskManagerAPI

View on GitHub ↗Related repositories →

active 2025-05-012025-06-20 (UTC)

Complete coverage26,694 / 26,694 hourly files (100%) · 2 absent upstream2023-08-152026-08-31 (UTC)
Events
66
Pushes
26
Pull requests
11
Issues
10
Stars
1
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 51 days from 2025-05-01 to 2025-06-20. Pushes: 26 total, peak 5 in a day. Pull requests: 11 total, peak 4 in a day. Issues: 10 total, peak 4 in a day. Comments: 0 total, peak 0 in a day. Stars: 1 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
Brailyn-Perez4322110

Recent activity

Latest issues, pull requests and releases

  • Issue#13Brailyn-Perez2025-06-20 02:19
    Práctica 8 - Pruebas unitarias con xUnit en la API
  • Pull request#14Brailyn-Perez2025-06-20 02:19
  • Pull request#14Brailyn-Perez2025-06-20 02:19
  • Issue#13Brailyn-Perez2025-06-19 21:42
    Práctica 8 - Pruebas unitarias con xUnit en la API
  • Issue#11Brailyn-Perez2025-06-19 18:31
    Desarrollo de la Etapa 7: Configuración de SignalR
  • Pull request#12Brailyn-Perez2025-06-19 18:31
  • Pull request#12Brailyn-Perez2025-06-19 18:31
  • Issue#11Brailyn-Perez2025-06-19 05:55
    Desarrollo de la Etapa 7: Configuración de SignalR
  • Issue#9Brailyn-Perez2025-06-19 05:50
    Desarrollo de la Etapa 6
  • Pull request#10Brailyn-Perez2025-06-19 05:50
  • Pull request#10Brailyn-Perez2025-06-19 05:50
  • Issue#5Brailyn-Perez2025-06-07 16:42
    Desarrollo de la etapa 4: Programación reactiva con Rx.NET
  • Pull request#6Brailyn-Perez2025-06-07 16:42
  • Issue#3Brailyn-Perez2025-05-30 01:21
    Desarrollo de la Etapa 3: Patrones de diseño en POO
  • Pull request#4Brailyn-Perez2025-05-30 01:19
  • Pull request#4Brailyn-Perez2025-05-30 01:19
  • Issue#3Brailyn-Perez2025-05-15 23:48
    Desarrollo de la Etapa 3: Patrones de diseño en POO
  • Issue#1Brailyn-Perez2025-05-14 03:24
    Crea Delegados para Gestionar como se manejan las tareas (VALIDACIONES)
  • Pull request#2Brailyn-Perez2025-05-14 03:24
  • Pull request#2Brailyn-Perez2025-05-14 03:24
  • Issue#1Brailyn-Perez2025-05-14 01:13
    Crea Delegados para Gestionar como se manejan las tareas (VALIDACIONES)

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.