Skip to content

application framework for ETL(ELT) pipeline, process

active 2023-08-17 → 2026-07-07 (UTC)

Archive files: complete28,781 / 28,781 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-26 (UTC)Some event types are under-captured. Data limits →
Events
800
Pushes
156
Pull requests
181
Issues
159
Recorded stars
2
Recorded forks
5

Activity over time

Daily event counts in the loaded window

Line chart, 1056 days from 2023-08-17 to 2026-07-07. Pushes: 156 total, peak 11 in a day. Pull requests: 181 total, peak 9 in a day. Issues: 159 total, peak 22 in a day. Comments: 75 total, peak 14 in a day. Recorded stars: 2 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Recorded stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
skxeve272638216
yasuhiro-ohba14041279
nissy040924080291314
dependabot[bot]453420
github-actions[bot]410026
cocoa-maemae362090
nasudadada20076
x-chi6000
Tsuyoposon4001
chiradeep-nanabala4012
ManzoorAhmedShaikh1001
alozasy1000

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 2 stars here means stars gained during the window, not the repo's star count.