基于 @itm4n 研究成果的本地提权实现。该工具通过劫持 Windows Server 上 NetMan 服务缺失的 wlanapi.dll 进行攻击。它利用系统 %PATH% 环境变量中存在可写目录的漏洞加载恶意载荷,从而实现从标准用户到 SYSTEM 的权限提升。
active 2026-01-04 → 2026-01-04 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 1 days from 2026-01-04 to 2026-01-04. Pushes: 1 total, peak 1 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| Byxs20 | 1 | 1 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
No issue or PR events — this repo's activity is pushes only.
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.