一个轻量级的 RPC(远程过程调用)框架,使用 Python 标准库实现,无需第三方依赖。支持同步和异步方法调用,以及心跳检测机制。 本项目原本是 Movan Server 项目的 RPC 模块,现在剥离出来做成一个独立的库,方便其他项目使用。
active 2025-05-29 → 2025-12-05 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 191 days from 2025-05-29 to 2025-12-05. Pushes: 4 total, peak 4 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| CGandGameEngineLearner | 4 | 4 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.