开发一个面向 Oberon-0 的逆向工程工具,根据一个输入的 Oberon-0 源程序自动绘制对应的设计图,这些设计图 包括子程序调用关系图和程序控制流设计图(例如程序流程图、 PAD 图、 N_S 图等)。设计过程涉及词法分析、语法分析、语法制导翻译、自动生成工具等重要环节。
active 2023-09-23 → 2025-06-26 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 643 days from 2023-09-23 to 2025-06-26. Pushes: 2 total, peak 2 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 6 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| CLong05 | 2 | 2 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
No issue or PR events — this repo's activity is pushes only.
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 6 stars here means stars gained during the window, not the repo's star count.