Skip to content

동국대학교 GPU 서버실 인프라 개발

active 2025-07-14 → 2026-09-29 (UTC)

Complete coverage28,343 / 28,343 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-07 (UTC)
Events
199
Pushes
114
Pull requests
30
Issues
12
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 443 days from 2025-07-14 to 2026-09-29. Pushes: 114 total, peak 8 in a day. Pull requests: 30 total, peak 11 in a day. Issues: 12 total, peak 2 in a day. Comments: 11 total, peak 6 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
pkhyrn2686950150
dongmin0204383520
aapdo222000
yoon6yo212122
coderabbitai[bot]11006
saokiritoni8611
Copilot4102

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.