Skip to content

CiscoDevNet/terraform-provider-sdwan

View on GitHub ↗Related repositories →

Terraform Cisco SD-WAN Provider

active 2023-08-17 → 2026-09-24 (UTC)

Complete coverage28,044 / 28,044 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-26 (UTC)
Events
2.7K
Pushes
552
Pull requests
526
Issues
313
Stars
11
Forks
12

Activity over time

Daily event counts in the loaded window

Line chart, 1135 days from 2023-08-17 to 2026-09-24. Pushes: 552 total, peak 24 in a day. Pull requests: 526 total, peak 11 in a day. Issues: 313 total, peak 11 in a day. Comments: 664 total, peak 48 in a day. Stars: 11 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
danischm1.1K464198240
tzarski04002424196
seconroy2722912077
dependabot[bot]2012016219
rrahimm1020055
koval4ukav281316
cmohorea260015
juchowan21017
crenus21019
wcmder20009
pavithran-rathinam180112
andreasbaekdahl14005
rchrabas8033
benkelly127003
lap-wingmen5004
rsaville24002
neiren4843021
suitesss3002
Anush-Mangaluru3000
torbbang2001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 11 stars here means stars gained during the window, not the repo's star count.