Projeto Integrador desenvolvido no 5º período da graduação em Análise e Desenvolvimento de Sistemas na Fatec de São José dos Campos. Esse projeto foi feito em parceria com a empresa IonicHealth.
active 2023-09-15 → 2023-11-26 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 73 days from 2023-09-15 to 2023-11-26. Pushes: 80 total, peak 10 in a day. Pull requests: 50 total, peak 9 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 1 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| thaleskerber | 98 | 55 | 39 | 0 |
| DiasVitoria | 26 | 14 | 7 | 0 |
| Lkduarte | 14 | 10 | 4 | 0 |
| EduardoPereiraCarvalho | 1 | 1 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.