Skip to content

Projeto Integrador desenvolvido no 6º período da graduação em Análise e Desenvolvimento de Sistemas na Fatec de São José dos Campos. Esse projeto foi desenvolvido em parceria com a empresa Altave.

active 2024-03-072024-06-27 (UTC)

Complete coverage26,391 / 26,391 hourly files (100%) · 2 absent upstream2023-08-152026-08-18 (UTC)
Events
63
Pushes
31
Pull requests
2
Issues
0
Stars
4
Forks
4

Activity over time

Daily event counts in the loaded window

Line chart, 113 days from 2024-03-07 to 2024-06-27. Pushes: 31 total, peak 6 in a day. Pull requests: 2 total, peak 2 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 4 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
thaleskerber262420
DiasVitoria7700

Recent activity

Latest issues, pull requests and releases

  • Releasethaleskerber2024-06-16 17:25
    Sprint 4
  • Releasethaleskerber2024-05-26 19:12
    Sprint 3
  • Releasethaleskerber2024-05-05 19:58
    Sprint 2
  • Releasethaleskerber2024-04-13 23:53
    Sprint 1
  • Pull request#1thaleskerber2024-03-25 12:46
  • Pull request#1thaleskerber2024-03-25 12:46

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 4 stars here means stars gained during the window, not the repo's star count.