Skip to content

基于Vue2&3 开发的智数园区是一个数字化园区管理项目,包括后台管理和可视化大屏两个部分,实现对园区内的楼宇、企业、员工、车辆和一体杆等进行数字化管理,以及通过园区 3D 模型实时展示园区概况。

active 2024-01-10 → 2026-01-13 (UTC)

Complete coverage27,434 / 27,434 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-01 (UTC)
Events
29
Pushes
19
Pull requests
0
Issues
3
Stars
4
Forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 735 days from 2024-01-10 to 2026-01-13. Pushes: 19 total, peak 5 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 3 total, peak 1 in a day. Comments: 0 total, peak 0 in a day. Stars: 4 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
CodeTeng191900
ECY-neko1000
LBupup1000
specialJC-T1000

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 4 stars here means stars gained during the window, not the repo's star count.