Skip to content

一句话需求,三条产线同时开工:Flow / CAD / PPT。 Flow:对话生成流程图,支持局部 patch / 全量 replace,一键应用到画布。 CAD:室内装修方案 → 2D 平面图(SVG)→ 装修图(并发出图/失败重试)→ BOM 清单导出。 PPT:从主题生成结构化草稿,支持页级增量迭代,把改稿变成可追踪的流程。

active 2026-02-15 → 2026-05-31 (UTC)

Complete coverage27,410 / 27,410 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-09-30 (UTC)
Events
39
Pushes
22
Pull requests
0
Issues
0
Stars
15
Forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 106 days from 2026-02-15 to 2026-05-31. Pushes: 22 total, peak 5 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 15 total, peak 3 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
CodingFeng101222200

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 15 stars here means stars gained during the window, not the repo's star count.