Skip to content

workspace是基于C++11的轻量级异步执行框架,支持:通用任务异步并发执行、优先级任务调度、自适应动态线程池、高效静态线程池、异常处理机制等。

active 2023-08-15 → 2025-07-01 (UTC)

Complete coverage27,341 / 27,341 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-09-27 (UTC)
Events
703
Pushes
8
Pull requests
5
Issues
17
Stars
549
Forks
82

Activity over time

Daily event counts in the loaded window

Line chart, 687 days from 2023-08-15 to 2025-07-01. Pushes: 8 total, peak 1 in a day. Pull requests: 5 total, peak 2 in a day. Issues: 17 total, peak 2 in a day. Comments: 38 total, peak 3 in a day. Stars: 549 total, peak 15 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
CodingHanYa478328
Daveshammer5023
zephyrize4000
GangRen10243001
yukai090203002
ChaoII2001
chaxxro1000
DeHby1001
mydsyc1000
HandsomeGiao1000
MingYueRuYa1001
IceForChoco1000
Side-Cloud1000
MuYuLinZhong1001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 549 stars here means stars gained during the window, not the repo's star count.