active 2024-10-15 → 2026-04-08 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 541 days from 2024-10-15 to 2026-04-08. Pushes: 11 total, peak 2 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 19 total, peak 10 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| albinzayedrawan | 19 | 5 | 0 | 0 |
| zsh811 | 8 | 4 | 0 | 0 |
| amnabubshait | 2 | 2 | 0 | 0 |
| reemburshaid | 1 | 0 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
- Issue#10reemburshaid2025-04-29 16:26CMPE 495B Presentation & Poster
- Issue#9zsh8112025-04-28 17:37CMPE 495B Final Report
- Issue#10zsh8112025-04-26 08:49CMPE 495B Presentation & Poster
- Issue#9zsh8112025-04-26 08:47CMPE 495B Final Report
- Issue#8zsh8112024-12-24 13:07CMPE 495A Final Presentation
- Issue#6albinzayedrawan2024-12-19 15:54Progress Report 4: Design
- Issue#5albinzayedrawan2024-11-28 14:59Progress Report 3B: Requirements & Assumptions
- Issue#4albinzayedrawan2024-11-28 14:59Progress Report 3A: Methodology
- Issue#3albinzayedrawan2024-11-01 09:51Progress Report 2: Related Works
- Issue#8albinzayedrawan2024-10-20 21:40CMPE 495A Final Presentation
- Issue#7albinzayedrawan2024-10-20 21:39CMPE 495A Final Report
- Issue#6albinzayedrawan2024-10-20 21:37Progress Report 4: Design
- Issue#5albinzayedrawan2024-10-20 21:34Progress Report 3B: Requirements & Assumptions
- Issue#4albinzayedrawan2024-10-20 20:24Progress Report 3A: Methodology
- Issue#3albinzayedrawan2024-10-20 20:21Progress Report 2: Related Works
- Issue#2albinzayedrawan2024-10-20 18:04Progress Report 1: Introduction
- Issue#2albinzayedrawan2024-10-20 18:04Progress Report 1: Introduction
- Issue#1albinzayedrawan2024-10-20 17:00#
- Issue#1albinzayedrawan2024-10-20 16:59#
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.