這是系統分析與設計課程的期末專案,實作的是罰單超速管理系統,且與台北城市儀表板做結合,以利數據分析。This is the final project of the system analysis and design course. It implements a speeding ticket management system and integrates it with the Taipei city dashboard to facilitate data analysis.
active 2024-12-24 → 2025-04-16 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 114 days from 2024-12-24 to 2025-04-16. Pushes: 38 total, peak 7 in a day. Pull requests: 4 total, peak 2 in a day. Issues: 58 total, peak 16 in a day. Comments: 6 total, peak 4 in a day. Stars: 7 total, peak 3 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| CongJie-Pan | 102 | 38 | 0 | 6 |
| Hoshinormal | 4 | 0 | 4 | 0 |
Recent activity
Latest issues, pull requests and releases
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 7 stars here means stars gained during the window, not the repo's star count.