Skip to content

DGP-Studio/Snap.Hutao.Deployment

View on GitHub ↗Related repositories →

Deployment tool for Snap.Hutao

active 2023-12-26 → 2025-11-06 (UTC)

Complete coverage28,014 / 28,014 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-25 (UTC)
Events
414
Pushes
95
Pull requests
14
Issues
23
Stars
113
Forks
5

Activity over time

Daily event counts in the loaded window

Line chart, 682 days from 2023-12-26 to 2025-11-06. Pushes: 95 total, peak 8 in a day. Pull requests: 14 total, peak 3 in a day. Issues: 23 total, peak 2 in a day. Comments: 25 total, peak 12 in a day. Stars: 113 total, peak 3 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
qhy040404927186
Lightczx382334
xinyi14837006
SSB-ARFCN6002
Masterain984120
Mikachu23334013
dingfom3002
qimingnan172001
NOWorEVER1000
Youhe03091001
a21126701471000
Tudorose1000

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 113 stars here means stars gained during the window, not the repo's star count.