Skip to content

DISL-Lab/IITP-2024-Enhancing-AI-Model-Reliability

View on GitHub ↗Related repositories →

IITP의 지원을 받아 2024년도에 시작한 "도메인 특화 자동 가치 연계 평가를 통한 AI 모델 신뢰성 향상" 과제의 성과관리를 위한 Repository 입니다.

active 2025-12-12 → 2025-12-26 (UTC)

Archive files: complete28,672 / 28,672 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-21 (UTC)Some event types are under-captured. Data limits →
Events
4
Pushes
3
Pull requests
0
Issues
0
Recorded stars
0
Recorded forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 15 days from 2025-12-12 to 2025-12-26. Pushes: 3 total, peak 1 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Recorded stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Recorded stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
hmin05033300

Recent activity

Latest issues, pull requests and releases

No issue or PR events — this repo's activity is pushes only.

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.