Skip to content

DUNE/2x2_Slow_Controls

View on GitHub ↗Related repositories →

This repository contains the code used for setting up the slow controls monitoring system for 2x2.

active 2023-12-05 → 2025-07-01 (UTC)

Moved — now at DUNE/SlowControls2x2 since 2025-08-04. This page keeps the history recorded under the old name.Linked by GitHub's repository id. Older names can be missing when an old name was later reused (e.g. forked back). Charts on this page cover this name only.

Archive files: complete28,851 / 28,851 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-29 (UTC)Some event types are under-captured. Data limits →
Events
641
Pushes
280
Pull requests
211
Issues
51
Recorded stars
4
Recorded forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 575 days from 2023-12-05 to 2025-07-01. Pushes: 280 total, peak 12 in a day. Pull requests: 211 total, peak 16 in a day. Issues: 51 total, peak 7 in a day. Comments: 45 total, peak 4 in a day. Recorded stars: 4 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Recorded stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
rvizarreta51421720145
lmlepin9393540
sungbinoh211740
Rossd4379900
Tom-Murphy-Physics3210
BrunoGelli1010

Recent activity

Latest issues, pull requests and releases

Work week

Pushes, PRs, issues and comments per weekday, 2023-12-05 to 2025-07-01 (UTC). Stars are left out.

1.7×
weekday vs weekend

Mostly weekdays

PR door speed

Human PRs opened in 2024 (99), closes followed to the end of June 2025. Closed means merged or rejected; bots and Copilot excluded.

1 minute
median time to close
97%
closed within a day
3%
still open

Half of the human pull requests opened here in 2024 were closed within 1 minute; 3% were still open at the end of June 2025.

Of 99 human pull requests opened in 2024: 97% closed within a day, 0% closed in 1 to 7 days, 0% closed in 7 to 30 days, 0% closed after 30 days, 3% still open.

Follow the sun

Human PR, issue, comment and review events in 2024-2025 (291 by 5 people), by UTC hour. Before the 2026 capture loss; pushes, bots and Copilot excluded.

Mostly Americas-hours
implied by the hours people are active

Busiest 17:00-20:00 UTC; 52% of activity falls in US Eastern working hours.

Mostly Americas-hours. Busiest 17:00-20:00 UTC; 52% of activity falls in US Eastern working hours. Share of all events in each zone's weekday working hours (09:00 to 18:00 local): Asia (UTC+8, 01:00 to 10:00 UTC) 15%, Europe (UTC+1, 08:00 to 17:00 UTC) 14%, US East (UTC-5, 14:00 to 23:00 UTC) 52%. Quietest eight hours: 06:00-14:00 UTC, 2% of events.

Working hours are 09:00-18:00 local, Monday to Friday, at fixed offsets with no daylight saving, so the shares are approximate; the windows overlap, so they do not add up to 100%. Hours describe when people work, not where they live.

Code vs talk

PR and issue events in 2024, before the 2026 capture fade. Counts events, bots included.

4.58PR events per issue eventcode-first workshop

PR events outnumber issues: this is where the code gets written, with almost no reviews on GitHub.

0.00 reviews per PR event (0 reviews)

In 2024 this repository logged 197 pull request events and 43 issue events, 4.58 PR events per issue event, and 0.00 reviews per PR event. Reading: code-first workshop.

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 4 stars here means stars gained during the window, not the repo's star count.