Skip to content

A set of quality control scripts for FreeSurfer- and FastSurfer-processed structural MRI data

active 2023-08-21 → 2026-10-02 (UTC)

Complete coverage27,987 / 27,987 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-24 (UTC)
Events
316
Pushes
92
Pull requests
50
Issues
32
Stars
39
Forks
11

Activity over time

Daily event counts in the loaded window

Line chart, 1139 days from 2023-08-21 to 2026-10-02. Pushes: 92 total, peak 7 in a day. Pull requests: 50 total, peak 8 in a day. Issues: 32 total, peak 3 in a day. Comments: 45 total, peak 3 in a day. Stars: 39 total, peak 3 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
kdiers114512128
m-reuter442955
dependabot[bot]200200
github-actions[bot]121200
costantinoai4001
julii-a3002
Rashmi10082001
flok-dev2000
PedrbVasc2001
acossa2001
annchenknodt2001
Copilot2011
XinQi77882002
RDoerfel2010
Luoyu-Wang2000
jonkoller1000
dusdnKR1010
agirodi1010
engrosamaali911001
matthewlyyy011000

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 39 stars here means stars gained during the window, not the repo's star count.