Skip to content

Sim-to-sim and sim-to-real deployment for Deep Robotics Robots, currently supporting M20 and Lite3

C++ · active 2025-11-25 → 2026-07-25 (UTC)

Complete coverage27,317 / 27,317 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-09-26 (UTC)
Events
49
Pushes
26
Pull requests
6
Issues
3
Stars
4
Forks
3

Activity over time

Daily event counts in the loaded window

Line chart, 243 days from 2025-11-25 to 2026-07-25. Pushes: 26 total, peak 4 in a day. Pull requests: 6 total, peak 2 in a day. Issues: 3 total, peak 1 in a day. Comments: 6 total, peak 4 in a day. Stars: 4 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
bopeng5221211902
HaoKa110550
hzy2653003
lanqi772001
zealoct1000
CcShuo1100
krishna221120231010
wf-hahaha1000
deeprobotics-sure1100

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 4 stars here means stars gained during the window, not the repo's star count.