Skip to content

Deepak-Work/SE-Dev_Project

View on GitHub ↗Related repositories →

Project Repo for CS-GY 6063

active 2024-01-30 → 2025-07-04 (UTC)

Complete coverage27,625 / 27,625 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-09 (UTC)
Events
291
Pushes
234
Pull requests
0
Issues
30
Stars
1
Forks
2

Activity over time

Daily event counts in the loaded window

Line chart, 522 days from 2024-01-30 to 2025-07-04. Pushes: 234 total, peak 20 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 30 total, peak 6 in a day. Comments: 0 total, peak 0 in a day. Stars: 1 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
zayaanra1138900
Jflores427979500
Anish565363400
Deepak-Work161400
AryanRai122200

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.