Skip to content

Modular Dock for StealthChanger

active 2024-11-182026-04-24 (UTC)

Partial coverage12,935 / 15,150 hourly files (85%) · 2 absent upstream · 2,210 failed, retryable2024-11-182026-08-11 (UTC)— sampled evenly across the window, so rankings and trends hold; absolute counts scale up.
Events
95
Pushes
6
Pull requests
12
Issues
2
Stars
61
Forks
7

Activity over time

Daily event counts in the loaded window

Line chart, 523 days from 2024-11-18 to 2026-04-24. Pushes: 6 total, peak 1 in a day. Pull requests: 12 total, peak 2 in a day. Issues: 2 total, peak 1 in a day. Comments: 7 total, peak 1 in a day. Stars: 61 total, peak 3 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
TheSin-12633
Apprisco3012
ddellant2020
nic3352010
jwellman802020
MikeYankeeOscarBeta2020
N3MI-DG1010
lindnjoe1000
testack181001
dudewithan021001

Recent activity

Latest issues, pull requests and releases

  • Pull request#29ddellant2026-04-24 17:44
  • Pull request#28ddellant2026-04-24 04:56
  • Pull request#25Apprisco2026-02-18 00:50
  • Issue comment#25Apprisco2026-01-17 07:23
    Add rapidburner goliath compatible frame/ magnetic frames
  • Issue comment#25Apprisco2026-01-16 18:55
    Add rapidburner goliath compatible frame/ magnetic frames
  • Issue comment#24TheSin-2026-01-02 15:16
    Is there any plan to arrange STL folder?
  • Issue comment#12testack182025-08-14 13:52
    Knomi 2 container issues
  • Issue comment#22TheSin-2025-07-30 16:24
    Anthead short standard
  • Pull request#21N3MI-DG2025-07-26 02:30
  • Pull request#20TheSin-2025-04-20 14:28
  • Pull request#20MikeYankeeOscarBeta2025-04-20 12:16
  • Pull request#19jwellman802025-03-09 17:41
  • Pull request#18jwellman802025-01-14 02:51
  • Pull request#17nic3352025-01-13 01:51
  • Issue#16nic3352025-01-12 23:01
    Manual M5x8 screws should e M5x10
  • Pull request#14TheSin-2025-01-04 16:23
  • Issue comment#14dudewithan022025-01-04 13:09
    Added A4T CAD
  • Pull request#15TheSin-2024-12-30 20:16
  • Issue comment#14TheSin-2024-12-30 20:16
    Added A4T CAD
  • Pull request#15MikeYankeeOscarBeta2024-12-30 20:08
  • Issue#12lindnjoe2024-11-18 00:04
    Knomi 2 container issues

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 61 stars here means stars gained during the window, not the repo's star count.