Skip to content

E3SM-Project/E3SM_test_scripts

View on GitHub ↗Related repositories →

Test scripts for cron and jenkins jobs

active 2023-09-11 → 2026-09-30 (UTC)

Archive files: complete28,693 / 28,693 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-22 (UTC)Some event types are under-captured. Data limits →
Events
283
Pushes
128
Pull requests
49
Issues
0
Recorded stars
1
Recorded forks
3

Activity over time

Daily event counts in the loaded window

Line chart, 1116 days from 2023-09-11 to 2026-09-30. Pushes: 128 total, peak 9 in a day. Pull requests: 49 total, peak 5 in a day. Issues: 0 total, peak 0 in a day. Comments: 32 total, peak 6 in a day. Recorded stars: 1 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Recorded stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
jgfouca6946132
jaelynlitz4524116
singhbalwinder368109
amametjanov342804
wadeburgess19981
rljacob15435
bartgol6330
AaronDonahue3300
oksanaguba3003
grnydawn2200
mkstratos1010
mt55551001
ndkeen1100
stephenprice1001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.