active 2025-10-16 → 2026-01-08 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 85 days from 2025-10-16 to 2026-01-08. Pushes: 8 total, peak 3 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 15 total, peak 5 in a day. Comments: 4 total, peak 1 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| leblancOUAL | 20 | 8 | 0 | 1 |
| MaddieN37-pdf | 6 | 0 | 0 | 2 |
| jd277822 | 1 | 0 | 0 | 1 |
Recent activity
Latest issues, pull requests and releases
- Issue#25leblancOUAL2025-12-03 15:43Ask machine shop to verify 3D CAD, identify materials if available, and being fabrication.
- Issue#24leblancOUAL2025-12-03 15:43Draw remaining sputter source parts in CAD
- Issue#26leblancOUAL2025-12-03 15:43Clean and bead blast all internal parts
- Issue#27leblancOUAL2025-12-03 15:43Reassemble source
- Issue comment#29leblancOUAL2025-12-03 15:36Write a program to gather temperature and humidity data from the annex
- Issue#31leblancOUAL2025-10-31 13:46Find and fix water leak in lines to cryopump in thin film lab (room 114)
- Issue comment#12jd2778222025-10-28 23:42Gather documentation for measuring voltage on the evaporator chamber.
- Issue#28leblancOUAL2025-10-28 14:52Reinstall source to beam line.
- Issue#23leblancOUAL2025-10-28 14:36Remove sputter source head for cleaning.
- Issue#22leblancOUAL2025-10-28 14:31Sputter Source Maintenance
- Issue#20leblancOUAL2025-10-28 14:01Relocate Fridge from the annex to LTR
- Issue#13leblancOUAL2025-10-28 13:23Install Swinger Magnet PSU
- Issue comment#8MaddieN37-pdf2025-10-24 18:52Check Ethernet Ports in 115 and 111
- Issue#8MaddieN37-pdf2025-10-24 18:52Check Ethernet Ports in 115 and 111
- Issue#11leblancOUAL2025-10-23 13:46Install new current meters for sputter source feed tube heater
- Issue#10MaddieN37-pdf2025-10-16 23:49Restore NaI BNC Cables in UGL to Original Positions
- Issue#8MaddieN37-pdf2025-10-16 23:43Check Ethernet Ports in 115 and 111
- Issue comment#6MaddieN37-pdf2025-10-16 23:41Move NaI Detector and Components to Annex
- Issue#6MaddieN37-pdf2025-10-16 23:41Move NaI Detector and Components to Annex
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.