Skip to content

EspacoCompasso/Reconstruction

View on GitHub ↗Related repositories →

Espaço para documentar e discutir plano de Obras do EC, tal como todas as intervensões e investimentos relacionados com o tema.

active 2024-11-182025-02-21 (UTC)

Complete coverage26,394 / 26,394 hourly files (100%) · 2 absent upstream2023-08-152026-08-18 (UTC)
Events
25
Pushes
1
Pull requests
0
Issues
12
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 96 days from 2024-11-18 to 2025-02-21. Pushes: 1 total, peak 1 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 12 total, peak 4 in a day. Comments: 10 total, peak 5 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
fabiocompasso17006
DaoExpression6104

Recent activity

Latest issues, pull requests and releases

  • Issue comment#9fabiocompasso2025-02-21 10:49
    Reunião com Senhorio
  • Issue#10fabiocompasso2025-02-21 10:46
    Reunião com Gestor de Condomínio (Sr. Carlos)
  • Issue comment#8fabiocompasso2025-02-20 20:17
    Reunião com Fiscais CMP
  • Issue#9fabiocompasso2025-02-11 12:06
    Reunião com Senhorio
  • Issue#9fabiocompasso2025-02-11 12:03
    Reunião com Senhorio
  • Issue#8fabiocompasso2025-02-11 11:58
    Reunião com Fiscais CMP
  • Issue#7fabiocompasso2025-02-11 11:53
    Desenho do Projeto
  • Issue comment#6fabiocompasso2025-01-09 12:03
    Fase 0: Projeto de Arquitetura
  • Issue#6fabiocompasso2025-01-09 11:59
    Fase 0: Projeto de Arquitetura
  • Issue#2fabiocompasso2025-01-09 11:51
    Reunião Fábio Pereira, Rodrigo Curamim, José Seed 21/11/24
  • Issue comment#3fabiocompasso2025-01-09 11:50
    Intervenção na porta da sala multi-usos
  • Issue#3fabiocompasso2025-01-09 11:50
    Intervenção na porta da sala multi-usos
  • Issue comment#2DaoExpression2024-11-26 14:12
    Reunião Fábio Pereira, Rodrigo Curamim, José Seed 21/11/24
  • Issue comment#2DaoExpression2024-11-26 13:16
    Reunião Fábio Pereira, Rodrigo Curamim, José Seed 21/11/24
  • Issue comment#2fabiocompasso2024-11-26 13:12
    Reunião Fábio Pereira, Rodrigo Curamim, José Seed 21/11/24
  • Issue comment#2DaoExpression2024-11-26 12:30
    Reunião Fábio Pereira, Rodrigo Curamim, José Seed 21/11/24
  • Issue comment#4DaoExpression2024-11-26 01:32
    Fase 1: Intervenção jardim debaixo da ponte
  • Issue comment#5fabiocompasso2024-11-25 12:28
    Fase 2: Intervenção na parte de trás do jardim
  • Issue#5fabiocompasso2024-11-25 12:21
    Fase 2: Intervenção na parte de trás do jardim
  • Issue#3fabiocompasso2024-11-25 12:09
    Intervenção na porta da sala multi-usos
  • Issue#2fabiocompasso2024-11-23 13:52
    Reunião Fábio Pereira, Rodrigo Curamim, José Seed 21/11/24
  • Issue#1DaoExpression2024-11-19 02:45
    Plano de Actividades

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.