Skip to content

active 2025-10-042025-10-05 (UTC)

Complete coverage26,406 / 26,406 hourly files (100%) · 2 absent upstream2023-08-152026-08-19 (UTC)
Events
53
Pushes
28
Pull requests
0
Issues
20
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 2 days from 2025-10-04 to 2025-10-05. Pushes: 28 total, peak 17 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 20 total, peak 20 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
lily-n2020000
EthanMoreta131300
rbutera039900
damianlapenavidal5500
FellowGFX1100

Recent activity

Latest issues, pull requests and releases

  • Issue#26lily-n202025-10-04 16:44
    Gatekeeper – MFA Before Stripe Confirm
  • Issue#7lily-n202025-10-04 16:32
    Setup Repo + Project Board
  • Issue#4lily-n202025-10-04 16:31
    Add MFA Modal Component
  • Issue#23lily-n202025-10-04 04:11
    Validate Demo Signatures
  • Issue#22lily-n202025-10-04 04:10
    Standardize JSON Responses
  • Issue#21lily-n202025-10-04 04:10
    Polish UI
  • Issue#16lily-n202025-10-04 04:08
    Add OTP Modal
  • Issue#15lily-n202025-10-04 04:07
    Add Flow Diagram to Deck
  • Issue#14lily-n202025-10-04 04:06
    Implement SSIM Verification
  • Issue#11lily-n202025-10-04 04:05
    Draft Pitch Deck Intro
  • Issue#10lily-n202025-10-04 04:04
    Preprocess Signature Image
  • Issue#9lily-n202025-10-04 04:04
    Stub Signature Endpoint
  • Issue#8lily-n202025-10-04 04:03
    Integrate DigiSign Modal
  • Issue#7lily-n202025-10-04 04:02
    Setup Repo + Project Board
  • Issue#5lily-n202025-10-04 04:01
    Scaffold Backend API
  • Issue#4lily-n202025-10-04 04:00
    Add MFA Modal Component
  • Issue#2lily-n202025-10-04 03:56
    Backend/API Developer
  • Issue#3lily-n202025-10-04 03:55
    Scaffold React checkout page (cart → pay button)
  • Issue#2lily-n202025-10-04 03:45
    Backend/API Developer
  • Issue#1lily-n202025-10-04 03:44
    Front end: checkout flow + set up process

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.