Skip to content

台湾实时地震监测(自用版)

active 2023-08-15 → 2026-10-12 (UTC)

Complete coverage27,730 / 27,730 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-13 (UTC)
Events
1.2K
Pushes
801
Pull requests
85
Issues
25
Stars
148
Forks
28

Activity over time

Daily event counts in the loaded window

Line chart, 1155 days from 2023-08-15 to 2026-10-12. Pushes: 801 total, peak 62 in a day. Pull requests: 85 total, peak 8 in a day. Issues: 25 total, peak 3 in a day. Comments: 37 total, peak 6 in a day. Stars: 148 total, peak 7 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
whes1015527479306
cstrikeasia239214204
kamiya10696205
yayacat4425180
bamboo0403121110
lowrt9171
PiscesXD9900
kent795003
wrteerw4003
YacineBoussoufa4004
Timyaya3001
KevinYu05043003
ids932163030
dependabot[bot]2020
xlionjuan2010
snowolf501612001
pull-request-size[bot]2020
luyii-code-12000
XingCh04052002
ChangHsuanCheng1000

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 148 stars here means stars gained during the window, not the repo's star count.