Skip to content

FC-DEV-FinalProject/FinalProject_5RE5_BE

View on GitHub ↗Related repositories →

FC 파이널 프로젝트 5RE5 조 백엔드 포크 서버

active 2024-11-03 → 2026-10-21 (UTC)

Complete coverage28,443 / 28,443 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-12 (UTC)
Events
2.3K
Pushes
437
Pull requests
514
Issues
99
Stars
2
Forks
22

Activity over time

Daily event counts in the loaded window

Line chart, 718 days from 2024-11-03 to 2026-10-21. Pushes: 437 total, peak 69 in a day. Pull requests: 514 total, peak 62 in a day. Issues: 99 total, peak 19 in a day. Comments: 297 total, peak 32 in a day. Stars: 2 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
alswooy4791821878
oowtl392816434
jongheonleee2897312326
K-KY232435519
github-actions[bot]20600206
yschoi12315131521
Ryu-Eun14727333
kimisadev273000

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 2 stars here means stars gained during the window, not the repo's star count.