Skip to content

FairTicket-Lab/FairTicket-FE

View on GitHub ↗Related repositories →

active 2026-02-062026-02-23 (UTC)

Partial coverage20,521 / 26,277 hourly files (78%) · 2 absent upstream · 5,753 failed, retryable2023-08-152026-08-13 (UTC)— sampled evenly across the window, so rankings and trends hold; absolute counts scale up.
Events
36
Pushes
6
Pull requests
8
Issues
7
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 18 days from 2026-02-06 to 2026-02-23. Pushes: 6 total, peak 1 in a day. Pull requests: 8 total, peak 3 in a day. Issues: 7 total, peak 4 in a day. Comments: 2 total, peak 2 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
mrangjw23582
sebeeeen1100

Recent activity

Latest issues, pull requests and releases

  • Pull request#11mrangjw2026-02-13 07:06
  • Pull request#11mrangjw2026-02-13 07:06
  • Issue#10mrangjw2026-02-12 02:45
    [FEATURE] FairTicket v4.0 동기화 — 트랙 명칭 변경 및 인증/대기열 API 연동
  • Pull request#9mrangjw2026-02-11 02:50
  • Pull request#9mrangjw2026-02-11 02:50
  • Pull request#9mrangjw2026-02-11 02:50
  • Issue#7mrangjw2026-02-11 02:29
    [refactor] 좌석 배치도 2단계 플로우 재구축 (VenueMap + SeatMap)
  • Issue#7mrangjw2026-02-11 02:21
    [refactor] 좌석 배치도 2단계 플로우 재구축 (VenueMap + SeatMap)
  • Issue#5mrangjw2026-02-10 04:36
    feat: Phase 1 프론트엔드 2차 구현 (장바구니 + 좌석 + 결제 + 마이티켓 + 정리)
  • Pull request#6mrangjw2026-02-10 04:36
  • Pull request#6mrangjw2026-02-10 04:35
  • Issue#5mrangjw2026-02-10 03:53
    feat: Phase 1 프론트엔드 2차 구현 (장바구니 + 좌석 + 결제 + 마이티켓 + 정리)
  • Pull request#4mrangjw2026-02-10 02:23
  • Issue#3mrangjw2026-02-10 01:42
    feat: Phase 1 FE 1차 구현 (기반 + 인증 + 목록 + 상세 + 대기열)
  • Issue#3mrangjw2026-02-10 01:42
    feat: Phase 1 FE 1차 구현 (기반 + 인증 + 목록 + 상세 + 대기열)
  • Issue comment#2mrangjw2026-02-09 23:40
    chore: 프로젝트 초기 환경 구성

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.