Utilities for interacting with the Fhenix CoFHE Coprocessor in a hardhat environment.
active 2025-03-27 → 2025-11-17 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 236 days from 2025-03-27 to 2025-11-17. Pushes: 38 total, peak 7 in a day. Pull requests: 11 total, peak 3 in a day. Issues: 0 total, peak 0 in a day. Comments: 4 total, peak 4 in a day. Recorded stars: 1 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Recorded stars
Release rhythm
Ships every ~3 days (median).
10 release days between 2024-01-01 and 2025-05-31 (UTC).
Release day = a UTC day with at least one GitHub Release, 2024-01-01 to 2025-05-31; median gap counts the open gap to the window end; single releases can drop out of GH Archive; a weekday shape needs 12.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| architect-dev | 51 | 36 | 9 | 4 |
| tovi-fhe | 4 | 2 | 2 | 0 |
Recent activity
Latest issues, pull requests and releases
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.