Algorithms for the connection planning problem of configurations composed of MISO modules, such as IM and TBB used in the article "Auto-Optimizing Connection Planning Method for Chain-Type Modular Self-Reconfiguration Robots"
active 2024-03-22 → 2024-10-15 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 208 days from 2024-03-22 to 2024-10-15. Pushes: 21 total, peak 19 in a day. Pull requests: 2 total, peak 2 in a day. Issues: 2 total, peak 1 in a day. Comments: 2 total, peak 1 in a day. Recorded stars: 2 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Recorded stars
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
Recent activity
Latest issues, pull requests and releases
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 2 stars here means stars gained during the window, not the repo's star count.