Skip to content

A full-cycle procurement digitalization MVP built for manufacturing environments — digitalizing the manual procurement process from Purchase Request creation through RFQ generation and vendor outreach, with role-based access control, full audit trail, and professional PDF document generation.

active 2026-03-222026-03-31 (UTC)

Complete coverage27,244 / 27,246 hourly files (100%) · 2 absent upstream2023-08-152026-09-23 (UTC)
Events
4
Pushes
3
Pull requests
0
Issues
0
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 10 days from 2026-03-22 to 2026-03-31. Pushes: 3 total, peak 2 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
Ghaithehasan3300

Recent activity

Latest issues, pull requests and releases

No issue or PR events — this repo's activity is pushes only.

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.