Group17 SS final project
active 2026-06-14 → 2026-06-16 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 3 days from 2026-06-14 to 2026-06-16. Pushes: 24 total, peak 15 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 10 total, peak 6 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| H030m | 16 | 8 | 0 | 0 |
| opaL1022 | 8 | 8 | 0 | 0 |
| temmie-950807 | 4 | 4 | 0 | 0 |
| smartalan91 | 3 | 1 | 0 | 0 |
| SuperRyanLin | 3 | 3 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
- Issue#226smartalan912026-06-16 04:42確保響應式介面設計
- Issue#225smartalan912026-06-16 04:41建立內部審核與分流儀表板
- Issue#214H030m2026-06-16 02:57UI desgin 1
- Issue#212H030m2026-06-16 02:53新增一個新的統計圖表
- Issue#195H030m2026-06-15 20:11設計任務看板
- Issue#189H030m2026-06-15 20:11實作每日彙整功能
- Issue#192H030m2026-06-15 20:11實作登入頁面
- Issue#187H030m2026-06-15 20:11建立關聯圖與任務依賴關係
- Issue#162H030m2026-06-15 19:17test
- Issue#150H030m2026-06-15 17:41merge all branch
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.