Skip to content

SMART on FHIR App Launch Protocol

active 2023-08-29 → 2025-12-30 (UTC)

Complete coverage28,108 / 28,108 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-29 (UTC)
Events
208
Pushes
110
Pull requests
26
Issues
24
Stars
5
Forks
3

Activity over time

Daily event counts in the loaded window

Line chart, 855 days from 2023-08-29 to 2025-12-30. Pushes: 110 total, peak 15 in a day. Pull requests: 26 total, peak 8 in a day. Issues: 24 total, peak 24 in a day. Comments: 27 total, peak 19 in a day. Stars: 5 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
jmandel1721081622
Healthedata19072
daniel-thomson2002
GinoCanessa2110
ATHAANGGORO101001
grahamegrieve1100
bvdh1010
isaacvetter1010

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 5 stars here means stars gained during the window, not the repo's star count.