active 2025-05-09 → 2025-06-26 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 49 days from 2025-05-09 to 2025-06-26. Pushes: 7 total, peak 4 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 12 total, peak 12 in a day. Comments: 0 total, peak 0 in a day. Stars: 1 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| HugoJanow | 18 | 6 | 0 | 0 |
| MathieuSim0 | 1 | 1 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
- Issue#11HugoJanow2025-05-09 20:35Chiffrer le PDF de démonstration en AES-GCM et l’héberger en local
- Issue#8HugoJanow2025-05-09 20:35Chiffrer le PDF de démonstration en AES-GCM et l’héberger en local
- Issue#10HugoJanow2025-05-09 20:33Réaliser les tests bout à bout, corriger les bugs et rédiger la documentation finale
- Issue#9HugoJanow2025-05-09 20:32Intégrer le déchiffrement du PDF côté client et afficher le document dans un viewer HTML
- Issue#8HugoJanow2025-05-09 20:32Chiffrer le PDF de démonstration en AES-GCM et l’héberger sur IPFS ou en local
- Issue#7HugoJanow2025-05-09 20:31Implémenter le workflow "Payer et lire" avec appels API et récupération de la clé
- Issue#6HugoJanow2025-05-09 20:31Initialiser le projet React et afficher un catalogue statique
- Issue#5HugoJanow2025-05-09 20:30Développer la route GET /confirm/:channelId et configurer ethers.js côté serveur
- Issue#4HugoJanow2025-05-09 20:30Mettre en place le backend Express et créer la route POST /open-channel
- Issue#3HugoJanow2025-05-09 20:30Développer et tester la fonction settleChannel() pour finaliser les paiements
- Issue#2HugoJanow2025-05-09 20:29Initialiser le projet Hardhat et déployer la fonction openChannel() sur Goerli
- Issue#1HugoJanow2025-05-09 20:29Définir les spécifications fonctionnelles et réaliser les maquettes UX
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.