Skip to content

NL2Flow: A PDDL Interface to Flow Construction

active 2024-02-16 → 2025-12-04 (UTC)

Archive files: complete28,648 / 28,648 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-20 (UTC)Some event types are under-captured. Data limits →
Events
936
Pushes
256
Pull requests
119
Issues
167
Recorded stars
12
Recorded forks
3

Activity over time

Daily event counts in the loaded window

Line chart, 658 days from 2024-02-16 to 2025-12-04. Pushes: 256 total, peak 14 in a day. Pull requests: 119 total, peak 7 in a day. Issues: 167 total, peak 10 in a day. Comments: 104 total, peak 9 in a day. Recorded stars: 12 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Recorded stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
TathagataChakraborti4361958129
jkeskingvillage237593656
ctpelok77121011
haz6006
ibm-mend-app[bot]2110
renovate[bot]2011
francescofuggitti1001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 12 stars here means stars gained during the window, not the repo's star count.